Town of Milford Building Code Fee Schedule
General rules regarding fees:
Permit application fees are doubled if work is started without a permit
$100.00 – No Show fees
$200.00 – up to 1,500 square feet
$320.00 – 1,501 to 2,000 square feet
$540.00 – 2,001 to 3,000 square feet
$800.00 – 3,001 to 4,000 square feet
$ .20 –per additional square foot over 4,000 square feet
Foundations (without further construction)
• $50.00 – foundation only
• Issued at the discretion of the Code Enforcement Officer
• For all residential and commercial projects
Manufactured Homes
• Includes modular and mobile homes
• Includes new and used
• Includes replacement and relocation
• Includes within and outside of a mobile home park
• Permit application fees based upon area of habitable space
• $100.00 – per section
• $100.00 – per each additional 1,000 square feet of finish work for 2nd floor of a modular home
Residential – Storage Buildings, Garages, and Carports
• Includes attached and unattached
• Includes alterations, additions and repairs excluding dwelling unit
• $50.00 – 144 to 300 square feet
• $100.00 – 301 to 1,500 square feet
• $200.00 – over 1,500 square feet
Residential – Alterations, Additions, Repairs and Conversions to Existing One and Two Family Dwellings (includes manufactured homes)
• Excludes attached garages
• $100.00 – up to 500 square feet
• $200.00 – 501 to 1,000 square feet
• $400.00 – 1,001 to 2,000 square feet
• $.10 – per additional square foot over 2,000 square feet
Residential – Unenclosed Porches and Decks
• $30.00 – up to 300 square feet
• $50.00 – 301 to 1,000 square feet
• $100.00 – over 1,000 square feet
Commercial – New Construction, Additions, Alterations and Conversions to Industrial, Places of Assembly, Institutional, Business, Mercantile, Commercial Storage and Multiple Dwellings
• Permit application fees based upon area of actual work area excluding crawl space and attic space
• $.26 – per square foot
• $200.00 – minimum fee
• **Town Owned buildings – no fee**
Commercial – Miscellaneous Utility Buildings
• Includes, but not limited to, buildings associated with communication towers, wind towers and gas production/exploration
• $150.00 – per building
Petroleum Storage Tanks
• Includes underground and above ground
• Includes new installations, replacement and reconditioned units
• $100.00 – per tank
Septic Systems
• Includes new installations
• Includes replacement of any or all parts of existing systems
• $50.00 – per system
Heating Equipment
• Includes heating systems involving gas, liquid and solid fuels
• No Charge – for primary unit when included in the work for new construction or remodeling
• $30.00 – per additional unit for new construction or remodeling
• $60.00 – per unit of replacement heating equipment
• No Charge – outdoor wood boilers
Change of Occupancy
• $75.00 – per change of occupancy that does not involve reconstruction or require a permit under any section of the Uniform Code
Temporary Certificate of Occupancy
• $80.00 – per three month period (renewals required, as necessary)
Swimming Pools, Hot Tubs and Associated Enclosures
• Includes in-ground and above-ground
• $50.00 – per above-ground pool and hot tub (without enclosure or deck)
• $100.00 – per above-ground pool and hot tub (with enclosure or deck)
• $200.00 – per in-ground pool
• $50.00 – per enclosure
Electrical Systems
• includes extension of existing system and installation of new electrical circuits or equipment
• $20.00 – per extension or installation
• $50.00 – per inspection of up to 15 devices (outlets, switches, etc.) not exceeding 120/240 volts A.C. (not including pools)
Demolition
• $25.00 – per demolition or removal
Fire Protection Equipment – Installation, Alteration and Maintenance
• Includes sprinkler systems and stand pipe systems
• Includes extinguishing agent systems other than water (eg, commercial range hoods; gas station canopy systems)
• Includes smoke and heat detection (other than single station residential device for one and two family dwellings)
• $50.00 – per fire protection system regulated by the Uniform Code
Duplicate Documents
• Includes permits and certificates
• $10.00 – per document
Property Research
• $30.00 – per parcel
Residential – Permit Renewal
• $75.00 – per renewal
Commercial – Permit Renewal
• Charge equals 25% of original permit fee
• $75.00 – minimum fee
Operation Permit Activities
• Fee included in fire inspection fee
______________________________
Fire Inspections – Initial Inspection
• Museums
$150.00-per inspection
• Schools
o $150.00 – per report booklet
• Commercial Structures
o $100.00 – per unit
• Places of Assembly (includes churches)
o $50.00 – per place with up to 100 occupancy load
o $100.00 – per place with over 100 occupancy load (exception for churches)
• Dormitories/Boarding Houses
o $50.00 – per unit
• Day Care Facilities
o $50.00 – per unit
• Multiple Dwellings
o $100.00 – up to 10 units
o $150.00- 11 to 20 units
o $200.00- for 21 units and above
• Hotels/Motels
o $100.00 – up to 20 rooms
o $150.00 – 21 to 50 rooms
o $200.00 – over 50 rooms
• Adult Care Facilities
o $100.00 – up to 10 units
o $150.00 – over 10 units
• Industrial and Institutional
o $100.00 – per inspection
• Foster Homes
o $30.00 – per inspection
• Residential Rentals
o $75.00 – per dwelling unit
• Youth Camps
o $50 – per hour of inspection time
• General Requests/Complaints
o $100.00 – per request/complaint
**Town owned buildings- no fee**
Fire Inspections – Follow-up Inspection(s)
• For inspections of corrections made to items found on a Code Enforcement Office list of common violations
o $50.00 – first follow-up inspection
o $75.00 – second follow-up inspection
o $100.00 – each subsequent inspection
• For inspections of corrections made to items NOT found on a Code Enforcement Office list of common violations
o No Charge – first follow-up inspection
o $50.00 – second follow-up inspection
o $100.00 – each subsequent inspection
_________________________________________
December 16, 2010
Item Fee
Trailer Park License 200.00
Permits:
Cell Tower 900.00
Lot Line Adjustment 25.00
Major Subdivision 135.00
ZBA Appeal 135.00
STTR Renewal 100.00
House 75.00
Barn 75.00
Site Plan Review 75.00
Special Use 75.00
Minor Subdivision 75.00
Major Subdivision Final 75.00
Addition 35.00
Fence, Garage, Pool, Shed, Sign, Deck 35.00
Replace/Repair 35.00
Alter, Extend, Remove, Demolish, Occupy 35.00
Zoning – General Use permit 35.00
General:
Subdivision Regulations 10.00
Zoning Regulations 10.00
_____________________________
Kenneth C. Sosnowski, Town Clerk
Effective January 1, 2011
Licensing: Spayed/Neutered – $6.50
Unspayed/Unneutered – $14.50
Enumeration fee – $5.00
Purebred/Kennel – surcharge of $3.00 each unsprayed/unneutered dog
1 to 10 dogs – $25.00
11 to 25 dogs – $50.00
26 or more – $100.00
Replacement Tags: $3.00 each
Impoundment: 1st – $45.00
2nd – $55.00
3rd – $65.00
Boarding Fee: $15.00/day
Late Fee: 60 days after month license due – $2.00
Kenneth C. Sosnowski
Milford Town Clerk